Buying Guide8 min read

Commercial Cleaning RFP Template: What to Include

By Imperial Cleaning IncPublished Updated

A commercial cleaning RFP should define your facility profile, a detailed scope of work, service frequency, quality standards, insurance and compliance requirements, and a clear scoring method. Include a mandatory site walk so vendors price the actual building, not a generic square-footage guess. Imperial Cleaning, based in Idaho Falls since 2015, provides written, scope-based quotes for facilities across Idaho and Utah.

What belongs in the RFP cover sheet?

Start with facility basics: legal entity name, site address, total square footage, number of floors, business hours, and primary contact for scheduling site walks. Note any security requirements, badge access, or after-hours entry rules.

State the contract term you want (typically 12 to 36 months), desired start date, and whether you are rebidding an existing program or launching a new one. Include the number of sites if this is a multi-location award.

List submission deadline, required format (PDF or portal upload), and where questions should be sent. A single Q&A window with written answers shared to all bidders keeps the process fair.

Scope of work section (copy-paste starter list)

Daily tasks: Empty all trash and replace liners; clean and disinfect restrooms (fixtures, mirrors, counters, partitions, floors); wipe high-touch surfaces (door handles, light switches, elevator buttons); vacuum carpeted areas and spot-clean visible spills; mop hard floors in entries, break rooms, and restrooms; tidy break rooms (countertops, sinks, tables).

Weekly tasks: Detail dust horizontal surfaces in offices and conference rooms; clean interior glass and smudges at entries; wipe kitchen appliances and microwave interiors; inspect supply closets and restock from client-provided or vendor-provided inventory (specify which).

Periodic tasks: High and low dusting; carpet extraction; hard-floor scrub and recoat or strip and wax; interior window cleaning; upholstery vacuuming. Define frequencies by area type or attach a frequency matrix.

Exclusions and owner responsibilities: Note who moves furniture, who provides consumables, and whether day porter or porter trash runs are in scope. Ambiguity here is a common source of change orders after award.

Insurance, compliance, and staffing requirements

Require general liability ($1M per occurrence / $2M aggregate is common for commercial accounts), workers compensation as required by state law, and auto liability if the vendor transports equipment or hauls trash off-site. Ask for a certificate of insurance naming your organization as additional insured before start date.

Request proof of bonding if your procurement policy requires it, W-9, business license, and a written statement that all workers are employees or properly documented subcontractors. Ask whether the vendor conducts background checks for staff with after-hours access.

Specify green-product requirements, SDS availability, and any industry rules (HIPAA awareness for medical-adjacent sites, food-safe protocols near production areas). Vendors should describe training and supervision, including who inspects the site and how often.

Site walk and bid instructions

Mandate a site walk for all finalists. Provide a sign-in sheet and a map of the building. Vendors should note floor types by zone, restroom count, special areas (server rooms, labs, warehouses), and any known problem areas (heavy salt at entries, oily machine tracks).

Instruct bidders to price the written scope exactly. Prohibit alternate frequencies unless submitted as a clearly labeled optional line item. Require a fixed monthly price, list of assumptions, and hourly rate for out-of-scope work.

Include a sample service schedule (nightly, 5x weekly, etc.) and your expected holiday policy. Ask how the vendor handles call-outs, fill-in staff, and emergency spills.

Scoring criteria you can copy into the RFP

Price (30%): Compare total cost for the defined scope, not the lowest line item alone.

Scope compliance (25%): Check every required room, task and frequency.

References and experience (15%): Ask references about relevant scope, consistency and communication.

Quality and inspection plan (15%): Compare the written inspection and correction process.

Insurance, safety, and sustainability (10%): Meets minimums, green options if required, documented training.

Interview and site walk notes (5%): Record access questions and understanding of the building. This example totals 100%; adjust all weights together if your priorities differ.

Step-by-step process

  1. 1

    Define facility profile and contract term

    Document square footage, hours, locations, floor types, and desired contract length. Identify internal stakeholders who will score bids.

  2. 2

    Draft scope and frequency matrix

    List daily, weekly, and periodic tasks by area. Specify owner vs vendor responsibilities for supplies and furniture moving.

  3. 3

    Set insurance and compliance minimums

    Include liability limits, workers comp, additional insured, and any industry-specific requirements.

  4. 4

    Publish RFP and hold a site walk

    Share the same Q&A answers with all bidders. Require attendance or allow a documented substitute walk.

  5. 5

    Score bids with a weighted matrix

    Compare scope compliance and references, not price alone. Shortlist two to three vendors for final interviews.

  6. 6

    Award and document transition dates

    Issue a letter of intent with start date, key contacts, and a 30-day transition plan if switching vendors.

Editable RFP and scoring worksheet

Illustrative procurement weights total 100%. Change them to suit your procurement policy, then confirm the total before comparing vendors.

Editable RFP and scoring worksheet
CriterionWeightEvidence to request
Price30%Total for the same defined scope
Scope compliance25%Room and task matrix
References15%Relevant reference conversations
Quality plan15%Inspection and correction process
Insurance and safety requirements10%Documents required by your organization
Site review5%Access and building-specific questions

Use this worksheet for your property.

Download the editable Markdown text file. Open it in a text editor or copy it into your preferred document tool. No email required.

Download editable worksheet

Check your RFP weights

Illustrative one-provider scorecard. Enter ratings from 0 to 5. The tool calculates a score only when weights total 100%. Entries stay in this page and are not sent or saved.

CriterionWeight (%)Rating (0-5)
Price
Scope compliance
References
Quality plan
Insurance and safety
Site review

Weights: 100%. Enter all six ratings between 0 and 5.

Frequently asked questions

How long should vendors have to respond to a cleaning RFP?

Two to three weeks from publication to submission is typical for a single site. Allow an extra week for multi-location portfolios or if holidays fall in the window.

Should price be the top scoring factor?

Price should be weighted heavily but not alone. Scope gaps and weak QA processes often cost more than a slightly higher monthly fee through rework, complaints, and turnover.

Is a site walk required?

Yes, for accurate pricing. Square-footage-only bids miss restroom counts, floor mix, access constraints, and periodic work that drives real cost.

What contract length is standard?

One to three years is common, often with an annual price review clause. Shorter terms give flexibility; longer terms can stabilize pricing if scope is well defined.

Find this useful? Add Imperial Cleaning Inc as a preferred source in Google.

Discuss your cleaning scope

Imperial Cleaning Inc handles construction and commercial cleaning across Idaho and Utah.